BSNF Industrial Waste Water Improvements
                  		
                  		Seattle, WASHINGTON
                	 
              	 
              	
                	     	     	
										
						LOCATION:
						Seattle, WASHINGTON
						
						PROJECT DESCRIPTION:
 
						
New Lift Station, New Grit Chamber, New Oil Water Separator with new electrical and controls to the lift station.
						
						PROJECT TYPE: 
						LIFT STATIONS
							
						
COMPLETION DATE: 
						2015
																																
					
					
Contract amount - $1,750,000.00
 
Work consisted of:
 
Installation of approximately 1500 LF of double contained HDPE Industrial Waste Pipe that ran from the new lift station to the WWTP.
 
2 New Manholes were installed as well as a new grit chamber, new Oil Water Separator and new Lift Station.
 
All new electrical and controls were installed to ensure the lift station ran properly.